字典九九>英语词典>bolt out翻译和用法

bolt out

英 [bəʊlt aʊt]

美 [boʊlt aʊt]

把…关在外面; 急逃

英英释义

verb

  • leave suddenly and as if in a hurry
    1. The listeners bolted when he discussed his strange ideas
    2. When she started to tell silly stories, I ran out
    Synonym:run offrun outboltbeetle off

双语例句

  • Through the failure analysis of connecting bolt of down rod, it points out that it is not correct to put the thinner nut outer side if the double nut anti-loose method is adopted.
    通过对游梁式抽油机对接式连杆下接头连接螺栓的失效分析,指出了采用双螺母防松时,将薄型螺母放置在外侧是不恰当的。
  • And according to the maximum load on the bolt, the method for designing the bolt is worked out, and an example of calculation is presented.
    根据螺栓最大载荷,得出了螺栓的强度条件和设计方法,并举实例作了计算。
  • I saw a man bolt out of [ into] our backyard.
    我看到一个男人从我们家的后院窜出去[窜进我们家后院]。
  • The contacting positions were analyzed in detail, and the reasonable value of bolt prestress was given out on the condition of good contact.
    对接触部位进行详细分析,提出在满足良好接触的条件下螺栓预紧力的合理值。
  • Systematic rock bolt support and shotcrete were carried out for the surrounding rock and reinforcement was done locally for rock stability.
    对围岩采用系统喷锚支护,局部作加强处理,稳定性良好。
  • The cat will probably bolt immediately out of the trap.
    猫将会或许立刻闩住离圈套。
  • Among a great deal of indexes in prescription bolting and optimization, release rate is chosen as the subject index. Main factors which impact release rate of tablet will be tried randomly to bolt and pick out a prescription.
    处方筛选优化的有很多指标,本研究以释放度为考察指标,选择影响片剂释放度的主要因素进行随机试验,进一步筛选优化处方。
  • Method for Pulling out Bolt with out Top of Turbine-generator
    汽轮机断头螺栓取出的方法
  • Based on the theory analysis of tangential anchor-hold of the inclined coal roadway bolt, the necessity of calculation of inclined coal seam bolt shear capacity is pointed out and the calculation expressions of the bolt shear capacity are found.
    对倾斜煤层巷道锚杆的切向锚固力进行了系统的理论分析,指出倾斜煤层巷道锚杆抗剪承载力计算的必要性,建立了锚杆抗剪承载力的计算公式。
  • The structure simulation test, thick board welding test, parts strength test and bolt shearing test in design were carried out, which surmounted the design difficulties such as lamellar tearing and considered Eiffel effect of curve type tower.
    设计中进行了结构模拟试验、厚板焊接试验、部件强度试验和螺栓剪切试验等,克服了层状撕裂等设计难点;考虑了曲线型塔的埃菲尔效应。